Premyro
CMMS & CAFM · Built for property teams

Every asset.
Every issue.
One platform.

Track, assign, and resolve maintenance across your entire building portfolio. Built for strata councils, property managers, and contractors.

Open Issues9
TeamMine
View all →

HVAC unit failure — Chiller B

Chiller Unit · Tower A · Floor 3

In ProgressOverdue

Emergency exit sign unlit

Main Building · Floor 2 · Space B12

TodoMay 12

Elevator inspection overdue

Tower A · Main Lobby

TodoMay 20

Repaint lobby walls

Ground Floor · Reception

In ProgressJun 1

Replace corridor lighting

Block B · Floor 1

TodoJun 8

Issue tracking

Track every issue across its lifecycle.

Drag cards between columns or use the list view — whichever your team prefers.

Todo3

Annual fire safety inspection

Medium
May 20
Ground Floor · Main Lobby

Emergency exit sign unlit

High
May 12Overdue
Floor 2 · Space B12

Replace corridor lighting

Low
Jun 8
Block B · Floor 1
MK
In Progress2

HVAC unit failure — Chiller B

Critical
Carrier AHU-01Tower A · F3
SC

Repaint lobby walls

Low
Jun 1

Surface prep complete, awaiting paint delivery.

Ground Floor · Reception
JW
Done3

Water leak repair — Storeroom B3

High
Block B · Floor 1

Elevator door sensor replaced

High
Tower A · Lobby
SC

Broken window replacement — Rm 204

Medium
Floor 2 · Room 204

Location tracking

Know exactly where every asset lives.

Map your buildings floor by floor. Every asset is pinned to a space inside a block — so your team can find it instantly, whether they're in the office or on-site.

  • Building → Block → Floor → Space hierarchy
  • Floor plan attachments per level
  • Asset chips with live open issue counts
  • Click any asset to open its full detail sheet
Tower A · Block 13F · 7 assets
3
Server Room
Main Switchboard
UPS Unit
Electrical
Panel Board
2
HVAC Zone
AHU-01
2
Chiller B
Lobby
Lift East
1
Fire Safety
Sprinkler B2
G
Empty
Acme Property GroupCMMS Report

Q1 2025 Maintenance Report

Created between 1 Jan 2025 and 31 Mar 2025

SummaryIssuesAssetsMaintenance

Prepared by James Wilson

Generated 9 May 2025, 14:32

47 issues

78% completion rate

Total issues

47

Completion

78%

Overdue

3

Avg resolution

4.2d

HVAC unit failure — Chiller B

Tower A · Floor 3 · HVAC Zone
Carrier AHU-01
In ProgressCritical
Created 1 Apr 2025Due 15 Apr 2025Sarah Chen
Chiller B has stopped cooling. Temperature in the server room is rising above safe operating limits. Immediate inspection required.

Timeline

Created

1 Apr 2025

James Wilson

Started

5 Apr 2025

Sarah Chen

Completed

Reporting

Audit-ready reports in seconds.

Set a date range, pick your filters, choose your sections — Premyro assembles a professional report covering issues, assets, maintenance history, and executive summaries. Every issue in the report shows a full lifecycle timeline.

  • Filter by status, priority, building, or assignee
  • Choose which sections to include
  • Per-issue timeline: created → started → completed
  • Exclude individual issues from the output
  • Print or share as PDF

Team management

Invite your whole team.

Add property managers, contractors, and strata council members. Control exactly what each person can see and do with role-based permissions you define.

  • Email invitations with one click
  • Custom roles with granular permissions
  • Contractor-specific dashboard view
  • Track pending invites in real time
Team4
JW

James Wilson

james@acme.co

Owner
SC

Sarah Chen

sarah@acme.co

Manager
RT

Rob Thomson

rob@contractor.com

ContractorPending
MK

Maya Kim

maya@acme.co

Contractor
contractor@example.comManagerSend invite →

Full asset inventory

Track every asset with manufacturer, model, serial number, service history, and QR code.

Maintenance schedules

Create recurring maintenance tasks and track them alongside your manual issues.

Multi-org support

Manage multiple organizations from one account — switch between them instantly.

Ready to take control of your facilities?

Join property teams using Premyro to streamline maintenance and keep buildings running.